CPD lecture ‘Extensions of Time in Construction Contracts – Problems and Solutions’
Posted on: 26 January, 2011
On 26 January 2011, The College of Estate Management hosted a free CPD Lecture and Open Evening in Dubai at the API Tower.
The lecture, ‘Extensions of Time in Construction Contracts – Problems and Solutions’ was delivered by Adrian Smith, Consultant in Project Management for CEM, to a very well attended and enthusiastic audience. The RICS APC Presentation was held at the beginning of the evening and the lecture was introduced by Sandie Lee, Associate at Davis Langdon and Associate Tutor for CEM.
‘Extensions of Time in Construction Contracts – Problems and Solutions’
Click on the arrows to navigate the slides.